Chapter 1. The Construction Team. |
|
|
|
|
|
Inspector Training and Knowledge of Specification. |
|
|
|
Allowances and Tolerances in Specifications. |
|
|
|
Lines of Authority on Construction Projects. |
|
|
|
|
|
|
|
|
|
|
|
Administrative Activities. |
|
|
|
|
|
Public vs. Private Contracts. |
|
|
|
Chapter 2. Responsibility and Authority. |
|
|
|
Responsibility of All Parties. |
|
|
|
Inspector Responsibility. |
|
|
|
|
|
Chapter 3. Safety on the Job. |
|
|
|
Construction Safety Guidelines. |
|
|
|
OSHA and Construction Safety. |
|
|
|
General Responsibility under Professional Construction Management and Design-build Contracts. |
|
|
|
Effect of Including Construction Safety Obligations in the Specifications. |
|
|
|
Applicability of State and Federal OSHA Provisions to a Project. |
|
|
|
|
|
|
|
|
|
Chapter 4. Documentation. |
|
|
|
|
|
Construction Progress Record. |
|
|
|
Electronic Record Keeping. |
|
|
|
|
|
|
|
Documentation of Intermittent Inspection. |
|
|
|
|
|
|
|
|
|
Construction Photographs. |
|
|
|
Chapter 5. Measurement and Payment. |
|
|
|
Types of Construction Contracts. |
|
|
|
Construction Progress Payments. |
|
|
|
Approval of Payment Requests. |
|
|
|
Basis for Payment Amounts. |
|
|
|
Evaluation of Contractor’s Payment Requests. |
|
|
|
|
|
Payment for Mobilization Costs. |
|
|
|
Partial Payments to the Contractor. |
|
|
|
|
|
Liquidated Damages during Construction. |
|
|
|
|
|
Final Payment to the Contractor. |
|
|
|
Chapter 6. Paving and Surfacing. |
|
|
|
Bituminous Surface Treatment. |
|
|
|
Stress Absorbing Membranes. |
|
|
|
Asphalt Concrete Pavement. |
|
|
|
Portland Cement Concrete Pavement. |
|
|
|
Chapter 7. Earthworks Inspection. |
|
|
|
|
|
Embankment Quality Control. |
|
|
|
Soil Cement Stabilization. |
|
|
|
The OSHA Competent Person Program. |
|
|
|
Chapter 8. Underground Pipelines. |
|
|
|
Pipe Installation Methods. |
|
|
|
|
|
Vitreous Clay Pipe (VCP). |
|
|
|
Unreinforced Concrete Pipe (CP). |
|
|
|
Reinforced Concrete Pipe (RCP). |
|
|
|
Reinforced Concrete Cylinder Pipe (RCCP). |
|
|
|
Mortar-lined-and-coated Steel Pipe (ML&C). |
|
|
|
Installation of Reinforced Concrete Cylinder Pipe (RCCP) and Mortar-lined-and-coated Steel Pipe (ML&C). |
|
|
|
|
|
Measurement for Payment for Pipelines. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Inspection of Pile Driving. |
|
|
|
|
|
Brief History & Development of Cement and Concrete. |
|
|
|
|
|
|
|
Principles of Reinforced Concrete. |
|
|
|
Concrete Construction Check List. |
|
|
|
|
|
Concrete under the Metric System. |
|
|
|
Chapter 11. Waterstop Joints in Hydraulic Structures. |
|
|
|
Quality Control of Thermoplastic Waterstop Joints. |
|
|
|
Specifying Waterstop Joints in Concrete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Chapter 13. Protective Coating. |
|
|
|
|
|
SSPC Surface Preparation Standards. |
|
|
|
Comparison of Various Generic Types of Protective Coatings. |
|
|
|
|
|
Evaluation of Surface Preparation Equipment. |
|
|
|
Mixing of Coating Material. |
|
|
|
Film Thickness Determination. |
|
|
|
Cleanliness Between Coats. |
|
|
|
Pinhole and Holiday Detection. |
|
|
|
Painting and Coating Application. |
|
|
|
Chapter 14. Project Closeout. |
|
|
|
|
|
|
|
|
|
Liquidated Damages for Delay. |
|
|
|
|
|
|
|
Preparations for Closeout. |
|
|
|
|
|
|
|
|
|
|
|
|